Main features:
(1) the use of box girder bridge, automatic submerged arc welding.
(2) using the I-beam track cable car conductive conducting new device, double girder overhead crane safe and reliable.
(3) The lifting mechanism is also provided in accordance with the requirements of the second set of safety devices. Increase reliability.
(4) parts standardization, serialization, universal.
(5) The control room unobscured, all institutions are in the control room manipulation, manipulation of flexible working comfort.
The products are widely applicable to ordinary handling and transporting heavy loads, but also with a variety of special spreader for special operations, with rain and equipment when the outdoor use. Data in the table for indoor double girder gantry crane, outdoor crane total weight and wheel pressure increased by about 5 percent, by the use of heavy cranes were divided into intermediate (A5) and weight class (A6) two operating system. Selection should indicate the work system, the work environment of the highest minimum temperature and the type of power and other technical requirements, the span can be designed and manufactured according to user requirements.
Tags:
Welcome to
iPeace.us
© 2024 Created by David Califa. Managed by Eyal Raviv. Powered by