Today we will look at the concrete mixing station after the production need to pay attention to the problem.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:SICOMA Twin-shaft Concrete Mixer,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.
1, freezing season, the end of the work should be placed as far as pumps, additional agent pump, a water tank, additional agent box, water and addition agent pipeline residual water and addition agent, to prevent damage to the pump and pipeline, and the water pump is started additive pump operation for 1-2 minutes.
2, clean up the wall of the agitation tank and ash, at the discharge port, stirring shaft and remove wreckage of concrete material door, these places to rinse water, when necessary can be a small amount of stones, and water into a stir for several minutes after the release of. With water commercial concrete batching plant, washing agent box and supply system.
3 electric mobile concrete mixer supplier, all lubricating points in the mixer discharge door hinges and the storage hopper and a weighing Doumen shaft, belt conveyer, machine supporting wheel, a pressing wheel, a roller, a bearing diesel mortar mixer (for sale), a driving chain, a screw shaft end and the lower end of the bearing and the engine gear such as.
4, checking the blade, scraper, stirring arm wear necessary adjustment gap or replacement; vibrator connecting bolts loosening phenomenon; check the electrical contactor, relay static and dynamic contact is damaged and burned