Capacity: 2300t/d Mineral: lead&zinc Service: test, design and equipment supplying

The project includes test, design and equipment supply. The crushing process adopts two stages closed-circuit while grinding process adopts MQGg2727 mill and hydrocyclone. Flotation adopts one roughing and two scavenging lead & zinc beneficiation. The concentrate is used for separating lead through re-grinding classification and four times of beneficiation. After that, the tailing is used for separating zinc through one roughing and three scavenging. After four times of beneficiation, the concentrate becomes tailing which could be used for producing sulfur through one roughing, one scavenging and one beneficiation.

More in >http://www.ballmillassurance.net

Views: 7

Reply to This

Latest Activity

Apolonia liked RADIOAPOLLON1242 AIGOKEROS PANOS's profile
Apr 24
Lucy Williams updated their profile
Jul 5, 2023
Sandra Gutierrez Alvez updated their profile
Oct 1, 2022
DallasBoardley updated their profile
Feb 8, 2022
RADIOAPOLLON1242 AIGOKEROS PANOS updated their profile
Feb 2, 2022
Shefqet Avdush Emini updated their profile
Jul 2, 2021
Ralph Corbin updated their profile
Jun 25, 2021
Marques De Valia updated their profile
Mar 24, 2021

© 2024   Created by David Califa. Managed by Eyal Raviv.   Powered by

Badges  |  Report an Issue  |  Terms of Service