Capacity: 2300t/d Mineral: lead&zinc Service: test, design and equipment supplying
The project includes test, design and equipment supply. The crushing process adopts two stages closed-circuit while grinding process adopts MQGg2727 mill and hydrocyclone. Flotation adopts one roughing and two scavenging lead & zinc beneficiation. The concentrate is used for separating lead through re-grinding classification and four times of beneficiation. After that, the tailing is used for separating zinc through one roughing and three scavenging. After four times of beneficiation, the concentrate becomes tailing which could be used for producing sulfur through one roughing, one scavenging and one beneficiation.