engineered hardwood flooring installation guidelines

1. Select a starter wall. An outside wall is best: it's most likely to be straight and square with the room. Measure out from this wall, at each end,hollow WPC joist for decking the width of two planks including the tongue plus the space needed (3/8” or "”) for expansion.
2. Snap a chalk line from these points, parallel to that wall.

3. Prior to installing the flooring, secure a straight edge inside the chalk line to act as a guide and to prevent the row of planks from shifting during installation. The straightedge could be a straight piece of lumber or piece of flooring. Alternatively, the first row can be face-nailed with finishing nails into the wood subfloor or sprig nailed into a concrete subfloor.

Using the proper trowel, hold the trowel at a 45° angle to ensure proper spread rate of adhesive. Apply pressure to allow the trowel to leave ridges of adhesive on the substrate with little adhesive left between the ridges. This will help to achieve the proper spread rate of the adhesive. Temperature and air flow across the adhesive can have an effect on the open time of the adhesive. 3X (or urethanes) will have a longer open time in areas of low humidity and will have a shorter open time in areas of high humidity. (See Adhesive label for further information).

4. Spread adhesive from the chalk line/straightedge out to approximately the width of two planks. Install the first row of starter planks along the chalk line/straightedge and secure into position with the tongue facing the starter wall.

1. After the subfloor has been properly cleaned and prepped cover the subfloor with 15lb. asphalt felt paper. This material will help to keep the floor clean and help to retard moisture from below (there is no complete moisture barrier system for staple or nail-down applications).

2. Select a starter wall. An outside wall is best: it's most likely to be straight and square with the room. Measure out from this wall, at each end, the overall width of the plank (board width + tongue + the space needed (3/8” or "”) for expansion).

3. Snap a chalk line from these points, parallel to that wall.
4. Install the first row of starter planks along the chalk line/straightedge and secure into position with the tongue facing away from the starter wall (toward you).Plastic Wood Flooring Decking Drill pilot holes through the face of the plank every 6” (in the dark grain); approximately 1” from the back edge of the board and secure planks with 1” finishing nails. Countersink nails and fill with appropriate colored wood filler – remove excess filler from surface.
5

. Blind nail at a 45° angle through the tongue 1”-2” from the end joints and every 6” in between along the length of the starter boards (Predrill holes to make this easier).[url=http://wpcindustry.com/sell/show.php?itemid=1025]PVC sheet extrusion line[/url] Depending on the width of the flooring it may be necessary to do this for the first few rows prior to using a pneumatic stapler/ nailer.

Views: 7

Comment

You need to be a member of iPeace.us to add comments!

Join iPeace.us

Latest Activity

Apolonia liked RADIOAPOLLON1242 AIGOKEROS PANOS's profile
Apr 24
Lucy Williams updated their profile
Jul 5, 2023
Sandra Gutierrez Alvez updated their profile
Oct 1, 2022
DallasBoardley updated their profile
Feb 8, 2022
RADIOAPOLLON1242 AIGOKEROS PANOS updated their profile
Feb 2, 2022
Shefqet Avdush Emini updated their profile
Jul 2, 2021
Ralph Corbin updated their profile
Jun 25, 2021
Marques De Valia updated their profile
Mar 24, 2021

© 2024   Created by David Califa. Managed by Eyal Raviv.   Powered by

Badges  |  Report an Issue  |  Terms of Service