Method for laying wood floors, 3.1.3 process steps, base material, quality requirements, construction period, acceptance norms should be recognized in the user before laying, construction must be strictly enforced; 3.2 on the wood floor base basic requirements: no dust, clean 3.2.1 no significant construction waste. 3.2.2 drying: must be at or below the local equilibrium moisture and moisture content, it is strictly prohibited to wet construction, and prevent leakage to ground water, such as heating water, kitchen and bathroom interface etc.. 3.2.3 level: by less than 5mm ruler test with 2m. 3.2.4 firm: base material must be qualified products, engineered wood flooring installation on concrete and orderly and fixedly connected in the ground, do not allow the loose. Both ends of the keel must be glued or nailed solid, solid. Forbidden with cement mortar to fill. Gross floor must be around the nail head, nail spacing should be less than 350mm. 3.2.5 expansion joints: the keel and the wall between the keel, and gross floor, gross floor and the wall between shall be joints. 3.2.6 corrosion: rot resistant with dry (width > 35mm) for Dragon aggregate. Needles plate, with high quality plywood (thickness > 9mm) for gross floor material, prohibited the use of the whole, if necessary for anticorrosive paint processing and pest treatment. 3.3 construction procedure is strictly prohibited in laying wood floors, and other indoor decoration engineering cross hybrid construction. 3.4 environmental consciousness raising awareness of environmental protection, indoor it is strictly forbidden to have serious pollution substance use at the grassroots level, such as tar, phenol. 3.5 construction premise that all primary wood floors approval, must be in the wood floor surface layer construction to achieve acceptance, otherwise not allowed laying construction of surface layer. 3.6 approval time wood floor surface layer acceptance, acceptance must be completed within three days after the. 4 surface inspection content of the 4.1 basic requirements of 4.1.1 suspension laid wood floor surface layer format the length of each side of the maximum not more than 8m, composite recycled deck italy the adjacent floor should keep the expansion joint, do the bridge connecting. The door must be cut off. 4.1.2 wood floor surface should be clean, smooth, no burr, no cracks, laying should be firm, not loose. 4.2 laying wood floor surface layer size allowable installation deviation of wood flooring surface size allowable installation deviation table 1 Table 1 allowable installation deviation in millimeters program allows the deviation of real wood floor of aggrandizement wood floor parquet bamboo floor flatness is less than or equal to 5 = 3 = 9 = 5 = 0.6 = 0.15 splicing height difference of 0.2 0.5 splicing gap width is less than or equal to 0.6 = 0.15 = 0.4 = 0.6 = 5 = 8 around the expansion joint is greater than or equal to 8 is more than 54.3 laying size allowable deviation measurement tool for laying size allowable deviation measurement tools are shown in table 2. Table 2 allowable deviation measuring tool measuring tool for measuring the flatness of the 2m project by the ruler and the feeler per chamber measurements of not less than two, maximum height difference or dial gauge feeler gauge splicing coordinate splicing gap width of expansion joint ruler feeler gauge around 5 warranty obligations floor laying is completed, the entrusted parties (the user side and the construction side) should be timely laying the floor surface approval, be assessed for the laying of the overall quality, service quality, quantity and do the procedures for receiving. Laying construction party shall issue a flooring warranty card (single), commitment warranty obligations floor.For more, please visit:http://compositedeckingfloor.com

Views: 4

Comment

You need to be a member of iPeace.us to add comments!

Join iPeace.us

Latest Activity

Apolonia liked RADIOAPOLLON1242 AIGOKEROS PANOS's profile
Apr 24
Lucy Williams updated their profile
Jul 5, 2023
Sandra Gutierrez Alvez updated their profile
Oct 1, 2022
DallasBoardley updated their profile
Feb 8, 2022
RADIOAPOLLON1242 AIGOKEROS PANOS updated their profile
Feb 2, 2022
Shefqet Avdush Emini updated their profile
Jul 2, 2021
Ralph Corbin updated their profile
Jun 25, 2021
Marques De Valia updated their profile
Mar 24, 2021

© 2024   Created by David Califa. Managed by Eyal Raviv.   Powered by

Badges  |  Report an Issue  |  Terms of Service