Mobile crushing station boosts the growth of environmental safety

Our Technology Co.,LTD, as the advanced Vertical Roller Mill machinery manufacturing enterprises in Henan Province, will contribute our share towards the creating of clean and civilized city for Zhengzhou city. To be able to solve the building waste problem, the company invests heavy capital in the research and advancement of waste disposal equipment. In 2009, the mobile crushing station also named as building waste therapy equipment was published, which quickly entered towards the market and selled well in both domestic and overseas, subject to the broad masses of customers.
There are two types of building waste disposal equipments: tires Vertical Roller Mill and track-type mobile crushing station. They can move without the influence of environment and sites, with Strong suitability and flexible configuration, reliable performance and easily repair. Our mobile crushing station continues to be successfully applied towards the remedy of construction waste in many big cities. It has made big efforts to create harmony and beautiful environment and home.
In accordance with the linked statistics, the quantity of development waste has accounted for 30%-40% from the complete urban waste in China. By the standard of 500-600 tons per million square meters, our nation will add about thirty billion square meters of construction waste by 2020, which can be a shocking figure. Connected reporter realized through the Zhengzhou government that there will likely be no location to place the development waste together with the urban advancement and framework widening. The standard treatment method will eat a big amount land, garbage-collected fright. With the exact same time the dust and gray from the eliminated and stacked approach has also brought on significant environmental pollution. Consequently, the relevant individual says, the city is built a construction waste disposal web-site within the southern suburbs so that you can gradually resolve the construction waste by unified collection and disposal.
After the collection of waste, the three power control will probably be closed, then we will hold people accountable for cleaning to reduce the environment pollution" introduced through the pertinent responsible man or woman. This solid waste transfer station continues to be constructed and operated since last year, its services scope covered 10 square kilometers, east to the Plains Avenue, west to Hertiage Road, north to North Ring Road, south to Red Road. The main development waste has muck, concrete, waste brick, abandon soil, disposable material, mud and other wastes. These can be used to produce the corresponding strength grade of concrete, mortar or the preparation of block, wallboard, floor tiles and other building materials after screening, can also be used for road pavement building.

Views: 1

Comment

You need to be a member of iPeace.us to add comments!

Join iPeace.us

Latest Activity

Apolonia liked RADIOAPOLLON1242 AIGOKEROS PANOS's profile
Apr 24
Lucy Williams updated their profile
Jul 5, 2023
Sandra Gutierrez Alvez updated their profile
Oct 1, 2022
DallasBoardley updated their profile
Feb 8, 2022
RADIOAPOLLON1242 AIGOKEROS PANOS updated their profile
Feb 2, 2022
Shefqet Avdush Emini updated their profile
Jul 2, 2021
Ralph Corbin updated their profile
Jun 25, 2021
Marques De Valia updated their profile
Mar 24, 2021

© 2024   Created by David Califa. Managed by Eyal Raviv.   Powered by

Badges  |  Report an Issue  |  Terms of Service