The whole area is now in a bad condition

The whole area is now in a bad condition and has to be regenerated.URBAN STRATEGY The office building finalized December 2007 is the first stage of an ensemble of five buildings, main gallery, atriums etc. which will how to build a fence top flower box Trinidadreplace step by step the existing textile industry on a plot of 1,4 hectares. The second building – twin replica of the first – is to be finalized December 2008. The other three will finalize this modular “small city” at the beginning of 2015.

An urban landscape concept connecting the old baroque district how to measure hollow of collar bonewith the west of the town is now an undergoing project.ARCHITECTURE The scale of the building(s) was careful chosen, considering the characteristics of the site, the proximity of the old urban decorative exterior wood screens Mexicostructure. Part of a future coherent ensemble, the first building, as the second one, is characterized by an overlapping of functional layers, namely a basement with parking .

Views: 1

Comment

You need to be a member of iPeace.us to add comments!

Join iPeace.us

Latest Activity

Apolonia liked RADIOAPOLLON1242 AIGOKEROS PANOS's profile
Apr 24
Lucy Williams updated their profile
Jul 5, 2023
Sandra Gutierrez Alvez updated their profile
Oct 1, 2022
DallasBoardley updated their profile
Feb 8, 2022
RADIOAPOLLON1242 AIGOKEROS PANOS updated their profile
Feb 2, 2022
Shefqet Avdush Emini updated their profile
Jul 2, 2021
Ralph Corbin updated their profile
Jun 25, 2021
Marques De Valia updated their profile
Mar 24, 2021

© 2024   Created by David Califa. Managed by Eyal Raviv.   Powered by

Badges  |  Report an Issue  |  Terms of Service