WPC building template has been widely used in modern construction of concrete pouring, in releasing the demolition process should pay attention to some problems, the following detailed description of: flat pvc sheet India supplier
1. When removing excessive force than it should, and should be promptly removed and put to carried away, put together ready to use again.
2. When removing a certain order: it should be demolished after the branch, and then the first branch. Bear part of the first non-demolition, dismantling bear some of the weight, and is generally the first part of the first installation of the demolition.
3. When removing the frame should be the first film and then dismantle the column bottom, in the face of large span should be the first pillar of the lower beam is split in the middle and then the sides. pvc shower wall panels
4. When removing the cantilever support should be at the top in the end the Ministry of demolition, when the side edge beam should first remove the beam and then split the beam arm.
5. When removing the multi-storey building, the upper floor if it is at the time of pouring concrete pillar next layer can not be removed, the pillar layer can be removed part of the floor.
6. When the demolition of the film should pay attention to the concrete surface is not damaged, the entire template does not hurt when you fall to the people. wood wall cladding Argentina